The quantity surveyor is the person on your side who knows what the building costs at every stage. This is what that means in practice, from the first sketch to the final account.

Updated · September 20266 min readMuscat · Oman

Before the design is fixed

The first job is an order-of-cost estimate, then an elemental cost plan as the design develops: substructure, frame, envelope, finishes, services and external works, each with a budget. This is where the quantity surveyor earns the fee. Changing the structural grid on paper costs nothing. Changing it after tender costs a variation.

At tender

The quantity surveyor measures the drawings into a bill of quantities using a standard method of measurement, usually NRM or SMM in Oman, so every item is traceable to a drawing and every contractor prices the same quantities. The bill goes out with the specification, the preliminaries and the contract conditions. When bids return, the QS checks arithmetic and rates, normalises exclusions and recommends the award.

During construction

Each month the QS measures the work in place, checks the contractor's payment application against it and certifies the amount earned. Variations are measured and valued when they are instructed, not argued about at the end. A monthly cost report states the cost to date, the cost to complete and the forecast final account, so the client is never surprised.

At the end

The final account reconciles the contract sum, the measured work, the variations, any claims and the retention into one agreed figure. Done properly, it is a formality. Done badly, it is a dispute.

Client-side and contractor-side

Contractors employ quantity surveyors to price work and protect their margin. A client-side QS does the opposite: independent measurement, independent certification and advice that is only ever for the owner. On any project of size you want your own.

Standards you will hear about in Oman

NRM, the RICS New Rules of Measurement, and the older Standard Method of Measurement are the measurement standards most bills follow. FIDIC forms are the most common standard contracts on larger private and public projects, with the Oman Standard Documents used on government work. Your QS should be fluent in whichever your contract uses.

Common questions

Is a quantity surveyor the same as an estimator?
No. An estimator prices a job once, usually for a contractor. A quantity surveyor manages cost from the first estimate to the final account and certifies payments along the way.
When should I hire a quantity surveyor?
At concept stage, before the design is fixed. A cost plan then is worth more than any saving negotiated later.
Do I need a QS for a single villa?
A bill of quantities and a proper tender pay for themselves on most villas. Full monthly cost control is optional on small jobs and essential on large ones.
Can a QS help after the project has started?
Yes. A commercial health check on cost, programme and contract is a common starting point for a project that has drifted.

Sources

This guide is general information based on the sources above and our experience in Oman. Rules and fees change; confirm the current position with the relevant authority before acting.

Apply it

Want this done for your project?

Send us the plot, the stage and what you are trying to build. We reply within one business day.

Or WhatsApp us

We use your details only to respond to this enquiry. You can also email hello@omegaglobalbusiness.com directly.

WhatsApp