Skip to content
OGB Construction

BOQ & Tender Documentation in Muscat, Oman.

Tender packs that price like for like.

Based in
Muscat · working across Oman
Reply time
Within one business day
BOQ & Tender Documentation — OGB Construction, Muscat
Cost & commercial02

What we do

BOQ & Tender Documentation, done properly.

Quantities measured to a recognised standard method of measurement, issued with specifications, preliminaries, pricing schedules and the conditions of contract as one coherent package. A tight document is what stops qualified bids and day-one variations.

Take this service on its own, or as part of the whole project. Either way, one team in Muscat is accountable for it.

What you get

  • 01

    Measured bills of quantities (NRM / SMM)

  • 02

    Technical specifications and preliminaries

  • 03

    Pricing schedules and schedules of rates

  • 04

    Conditions of contract and appendices

  • 05

    Tender drawing register and issue control

One team

Design, cost and site under one roof. One point of contact.

Independent advice

We hold no construction contract, so nothing we recommend pays us more.

Based in Oman

A Muscat office that knows the rules, the climate and the market.

Straight answers

A clear report every month. Good news and bad in the same place.

When you need it

Three moments this pays for itself.

  1. 01

    Your drawings are ready and contractors are asking for a bill of quantities to price against.

  2. 02

    Bids you received last time were impossible to compare because every contractor priced something different.

  3. 03

    A lender or partner wants a measured, priced document before releasing funds.

How we do it in Oman

The way we work.

We measure from your drawings to NRM or SMM, with every item traceable to a drawing reference. The bill is issued with the specification, preliminaries and contract conditions as one pack, so every contractor prices the same job. Tight documents are what stop qualified bids and the day-one variations that follow them.

How it works

Five stages. One team.

  1. 01

    Brief

    We listen. Site, budget, timeline.

  2. 02

    Design

    Plans that are ready to build.

  3. 03

    Tender

    The right contractor, chosen fairly.

  4. 04

    Build

    Our engineers on site every day.

  5. 05

    Handover

    Keys in hand. Paperwork complete.

Common questions

BOQ & Tender Documentation in Oman, explained.

Which standard do you measure to?
NRM or SMM, or the standard your contract names. Every quantity is traceable to a drawing.
How long does a BOQ take?
A villa takes days, not weeks. Larger buildings depend on the drawings. We confirm a date before we start.
Can you prepare a BOQ from our drawings?
Yes. Send the drawings and the specification and we measure from them.

Where we work

Based in Muscat. Working across Oman.

Most of our projects are in Muscat Governorate, and our engineers travel to sites in every governorate. Distance changes the logistics, not the standard.

Al MoujQurumAl KhuwairBausherAl SeebAl HailAl KhoudMuttrahRuwiAl AmeratMadinat Al IrfanSultan Haitham City
SoharBarkaNizwaSurSalalahDuqmIbriRustaq

Scope it with us

Tell us about the project.

The site, the stage it is at and what you need. We reply within one business day with the right scope, even when it is smaller than you expected.

Or WhatsApp us

We use your details only to respond to this enquiry. You can also email hello@omegaglobalbusiness.com directly.

WhatsApp